NoProject / Client / ConsultantsScope of WorksContract Value (RM)Period
1Menaiktaraf Loji Rawatan Air Pelubang,
Kubang Pasu, Kedah Darul Aman
Pakej Saluran Paip dan Skim Pida

KZ Engineering Sdn Bhd
To supply labour, material, plants, machineries and all necessary tools and equipment for the execution and completion of 11 Nos Pipe Crossing (Prestressed Concrete Girders) and Associated Works8.9 millionNov 2023 to June 2024
2Pembinaan Jalan Pintasan Cameron Highlands: Menaiktaraf Jalan Dari Bulatan Macdonald’s ke Persimpangan Brinchang / Time Tunnel (FT59) Dan Membina One Way Loop Di Kea Farm, Cameron Highlands, Pahang

Econpile (M) Sdn. Bhd.

To supply labour, material, plant, machineries and equipment for Infrastructure Works
29.737 MillionMay 2024 to March 2026

Menaiktaraf Loji Rawatan Air Pelubang (2024)

Crossing no. 7 – From Bkt Mengkuang B.Reservoir to Bkt Kayu Hitam CH. 6000.0 – CH. 6600.0
Crossing no. 8 – From Bkt Mengkuang B. Reservoir to Bkt Kayu Hitam CH. 7200.0 – CH. 7800.0
Crossing no. 10 – Overcrossing at Sungai Air Hitam at CH. 100.0 – CH. 175.0
Crossing no. 11- Overcrossing at Sungai Kerpan at CH. 5125.0 – CH. 5225.0

Pembinaan Jalan Pintasan Cameron Highland (2024)

Geotechnical Works – Slope Protection at CH 300m to CH 400m – Macdonald’s Roundabout to Brinchang / Time Tunnel
Earthworks – Slope Cutting