Completed Projects (Water Works)

NoProject / Client / ConsultantsScope of WorksContract Value (RM)Period
1Sungai Selangor Water Supply Phase 2 – Stage 1 Matang Pagar Reservoir. Hazama / Puncak Niaga SMHB & Ranhill Bersekutu. 45MG ‘Reinforced Concrete’ reservoir, including earthworks and pipe laying ,2100mm and 1800mm OD MS pipes.16.5 MillionApr 96 to Aug 98
2Sungai Selangor Water Supply Phase 2 – Stage 1 ,  Intake Plant. Hazama / Puncak Niaga SMHB & Ranhill Bersekutu.200MGD Intake Plant, include  coffer dam along Sg. Selangor for piling works and construction of pumping station.24.4 MillionApr 96 to Aug 98
3Sungai Selangor Water Supply Phase 2 – Stage 1 , Raw Water Pumping Plant – Manifold Pipes. Chemical aste ManagementS.B. / OTV SMHB  S.B.Installation of 2100mmǾ mild steel Manifold pipes.0.2 MillionApr 97 to Sep 97
4Sewerage Treatment Plant (STP) at Lot 1722, Bukit Sentosa, Mukim Serandah. Sam McCoy S.B.45,000 PE STP. Work include; all the necessary earthworks, piling and pipe laying works.  1.9 MillionNov 97 to May 98
5Sungai Selangor Water Supply Phase 2 – Stage 2, Batu Arang Reservoir. Hazama / Puncak Niaga SMHB & Ranhill Bersekutu 18MG RC reservoir, include excavation of 20,000m3 of hard material, slope protection, pipe laying and ancillary works 8.9 MillionApr 98 to Aug 00
6Greater Ipoh Water Supply II – Raising and Falling Mains Metropolitan Utilities Corp. BW Perunding.Laying of 3.5km 1000mm to 1600mmǾ  MS pipes1.2 MillionFeb 99 to July 99
7Batu Estate Water Supply Distribution System KL, Bukit Maxwell Reservoir. Konbina S.B. / JBAS SMHB S.B.6MG RC reservoir at Bukit Tunku3.3 MillionJul 99 to Aug 01
8Sewerage Treatment Plant at Lot 13431 Mukin Ulu Kelang. Sam McCoy S.B. Seri Jurutera Perunding.5,000PE STP. Work include; piles installation, RC structure and ancillary works.0.9 MillionNov 9 to Mar 00
9Sungai Selangor Water Supply Phase 3 (SSP3),  Intake and Raw Water Pumping Station Gamuda Engineering S.B. SMHB SB200MGD Raw Water Intake, works include cofferdams, intake structure, pumping station, pipe works and ancillary buildings. 21.5 MillionFeb 01 to Mar 03
10Cheras High Level Reservoir and Booster Station. Usahasama Norwest-Bina SMHB S.B.3MG RC reservoir and booster station. Works include; earthworks, slope stabilization, pipe laying and ancillary works.2.7 MillionJul 01 to Jul 02
11Sungai Selangor Water Supply Phase 3 (SSS3), Raw Water Pipelines – Stage 1 Gamuda Engineering S.B. SMHB S.B.Supply and lay of 5.5 km long 2000mmǾ MS pipes and ancillary works.8.8 MillionJul 01 to Mar 03
12Membaikpulih dan Menaiktaraf Jalan Persekutuan 5, Kapar – Sabak Bernam Water Services. HCM / Zabima Eng.& Const. S.B. JKR Malaysia.Supply  & lay 130 Km of 200mm to 700mmǾ MS pipes and ancillary works.33.6 MillionOct 01 to Jun 04
13Transmission Pipe at Bukit Chandang, Batang Kali to Antara Gapi. Prestasi Asia (M) / PKNS Kumpulan Jurutera PerundingSupply and lay 6.5km of 700mmǾ MS pipes and ancillary works; include 2 nos of pipe jacking under railway tracks6.0 MillionSep 02 to Feb 04
14Membaikpulih dan Menaiktaraf Jalan Muar-Melaka-Alor Gajah-Simpang Ampat Water Services. HCM / Zabima Eng.&Const. S.B. JKR (Melaka)Supply and lay 14 km of 100mm to 700mmǾ MS pipes and ancillary works4.2 MillionNov 02 to Mar 04
152.5MG RC Reservoir. Desaminium Jaya S.B. Reka Perunding S.B.2.5MG circular RC Reservoir; work include; earthwork and pipe laying.1.2 MillionJan 03 to Dec 03
1640,000PE (Module 2) Sewerage Treatment Plant. Desaminium Jaya S.B. Erinco SB40,000 PE STP, works include; earthworks, M&E installation and auxillary buildings.4.4 MillionFeb 03 to Dec 03
17Sungai Selangor Water Supply Phase 3 (SSS3), Raw Water Pipelines – Stage 1 Gamuda Engineering S.B. SMHB S.B.Supply and lay 5 km of 2000mmǾ MS pipes and ancillary works.7.5 MillionJune 03 to Jan 04
18Cadangan Pembangunan Komplex Loji Rawatan Enapcemar diatas Rezab JBA PT246, Wangsa Maju. Mewah Kota S.B. SMHB S.B.Sludge Treatment Plant for water Treatment Plant. Work include; pile installation, RC structures and M&E installation.1.8 MillionJune 04 to May 05
19Projek Pembangunan Bekalan Air dalam Daerah Sepang. Konbina Enterprise S.B. JK Bersatu S.B.5MG RC reservoir. Work include earthwork, RC structure and ancillary works. 4,6 MillionAug 04 to Nov 05
20Sungai Kinta Water Supply Scheme. Hajadi S.B. Angkasa Consulting Services S.B.Laying of 700, 800, 1000 and 1600mmǾ MS pipes (4,500m) and ancillary works.3.8 MillionJun 05 to Sep 06
21Kerja Pengalihan Paip Bekalan Air bagi Projek Menaiktaraf Laluan B9/FT015 – Sg. Buloh Lindang S.B. Sepakat Setia Perunding S.B.1]  1.6 km long – 1000mm, 2000mm and 2200mmǾ MS pipes. 2] 2 Km long – 200, 250, 400,450 and 600mmǾ MS pipes’ including const. and installation of chambers and valves.17.0 MillionJan 05 to Dec 06
22The Construction of Sewerage Treatment Plant Project Phase 2 – Package 3 at Sunggala, Port Dickson. Kajima Corp. MinConsult. S.B.60,000 Sewerage treatment plant along with piling and other civil works.19.0 MillionAug 06 to Apr 08
23Syabas Capex Works programme for Upgrading of Existig Twenty-Six (26) Water Treatment Plants. Mewah Kota S.B.4MG RC reservoir; works include earthworks, slope stabilization, pipe laying and connection and other infra works.11.0 MillionJuly 07 to May 08
24Syabas Capex Works Programme for Upgrading of Existing Twenty-Six (26) Water Treatment Plants in Selangor. Mewah Kota S.B.Refurbishment of RC reservoir; work incl. replacing the roofs and top portions of columns 1.8 MillionFeb 09 to Jun 09

Sungai Selangor Water Supply Phase 2 – Stage 1 (1997)

45MG RC Reservoir at Matang Pagar, Sg. Buloh  – construction of wall and columns in progress
200 MGD  Water Intake Plant at Batang Berjuntai  –  Double layer sheet pile cofferdam with waling and ground anchors

Sungai Selangor Water Supply Phase 2 – Stage 2, Bt. Arang (Year 1999)

12 MG RC reservoir – work  include; excavation of 20,000m3 of hard material, slope protection, laying of 1500mm dia. MS pipes and ancillary works.

Sungai Kinta Water Supply Scheme, Perak (2005)

Laying of 4.5 km long pipelines consisting of; 700mm, 800mm, 1000mm and 1600mm dia. MS pipes and ancillary works.

Kerja Pengalihan Paip Bekalan Air – Sg. Buloh (2007)

a) 1.6km long pipeline – 2200mm, 2000mm and 1000mm dia. MS pipes

b) 2.5km long pipeline –  150mm to 600mm dia. MS pipes.

Sewerage Treatment Plant, –   60,000 PE at Sunggala, Port Dickson (2008)