| No | Project / Client / Consultants | Scope of Works | Contract Value (RM) | Period |
| 1 | Sungai Selangor Water Supply Phase 2 – Stage 1 Matang Pagar Reservoir. Hazama / Puncak Niaga SMHB & Ranhill Bersekutu. | 45MG ‘Reinforced Concrete’ reservoir, including earthworks and pipe laying ,2100mm and 1800mm OD MS pipes. | 16.5 Million | Apr 96 to Aug 98 |
| 2 | Sungai Selangor Water Supply Phase 2 – Stage 1 , Intake Plant. Hazama / Puncak Niaga SMHB & Ranhill Bersekutu. | 200MGD Intake Plant, include coffer dam along Sg. Selangor for piling works and construction of pumping station. | 24.4 Million | Apr 96 to Aug 98 |
| 3 | Sungai Selangor Water Supply Phase 2 – Stage 1 , Raw Water Pumping Plant – Manifold Pipes. Chemical aste ManagementS.B. / OTV SMHB S.B. | Installation of 2100mmǾ mild steel Manifold pipes. | 0.2 Million | Apr 97 to Sep 97 |
| 4 | Sewerage Treatment Plant (STP) at Lot 1722, Bukit Sentosa, Mukim Serandah. Sam McCoy S.B. | 45,000 PE STP. Work include; all the necessary earthworks, piling and pipe laying works. | 1.9 Million | Nov 97 to May 98 |
| 5 | Sungai Selangor Water Supply Phase 2 – Stage 2, Batu Arang Reservoir. Hazama / Puncak Niaga SMHB & Ranhill Bersekutu | 18MG RC reservoir, include excavation of 20,000m3 of hard material, slope protection, pipe laying and ancillary works | 8.9 Million | Apr 98 to Aug 00 |
| 6 | Greater Ipoh Water Supply II – Raising and Falling Mains Metropolitan Utilities Corp. BW Perunding. | Laying of 3.5km 1000mm to 1600mmǾ MS pipes | 1.2 Million | Feb 99 to July 99 |
| 7 | Batu Estate Water Supply Distribution System KL, Bukit Maxwell Reservoir. Konbina S.B. / JBAS SMHB S.B. | 6MG RC reservoir at Bukit Tunku | 3.3 Million | Jul 99 to Aug 01 |
| 8 | Sewerage Treatment Plant at Lot 13431 Mukin Ulu Kelang. Sam McCoy S.B. Seri Jurutera Perunding. | 5,000PE STP. Work include; piles installation, RC structure and ancillary works. | 0.9 Million | Nov 9 to Mar 00 |
| 9 | Sungai Selangor Water Supply Phase 3 (SSP3), Intake and Raw Water Pumping Station Gamuda Engineering S.B. SMHB SB | 200MGD Raw Water Intake, works include cofferdams, intake structure, pumping station, pipe works and ancillary buildings. | 21.5 Million | Feb 01 to Mar 03 |
| 10 | Cheras High Level Reservoir and Booster Station. Usahasama Norwest-Bina SMHB S.B. | 3MG RC reservoir and booster station. Works include; earthworks, slope stabilization, pipe laying and ancillary works. | 2.7 Million | Jul 01 to Jul 02 |
| 11 | Sungai Selangor Water Supply Phase 3 (SSS3), Raw Water Pipelines – Stage 1 Gamuda Engineering S.B. SMHB S.B. | Supply and lay of 5.5 km long 2000mmǾ MS pipes and ancillary works. | 8.8 Million | Jul 01 to Mar 03 |
| 12 | Membaikpulih dan Menaiktaraf Jalan Persekutuan 5, Kapar – Sabak Bernam Water Services. HCM / Zabima Eng.& Const. S.B. JKR Malaysia. | Supply & lay 130 Km of 200mm to 700mmǾ MS pipes and ancillary works. | 33.6 Million | Oct 01 to Jun 04 |
| 13 | Transmission Pipe at Bukit Chandang, Batang Kali to Antara Gapi. Prestasi Asia (M) / PKNS Kumpulan Jurutera Perunding | Supply and lay 6.5km of 700mmǾ MS pipes and ancillary works; include 2 nos of pipe jacking under railway tracks | 6.0 Million | Sep 02 to Feb 04 |
| 14 | Membaikpulih dan Menaiktaraf Jalan Muar-Melaka-Alor Gajah-Simpang Ampat Water Services. HCM / Zabima Eng.&Const. S.B. JKR (Melaka) | Supply and lay 14 km of 100mm to 700mmǾ MS pipes and ancillary works | 4.2 Million | Nov 02 to Mar 04 |
| 15 | 2.5MG RC Reservoir. Desaminium Jaya S.B. Reka Perunding S.B. | 2.5MG circular RC Reservoir; work include; earthwork and pipe laying. | 1.2 Million | Jan 03 to Dec 03 |
| 16 | 40,000PE (Module 2) Sewerage Treatment Plant. Desaminium Jaya S.B. Erinco SB | 40,000 PE STP, works include; earthworks, M&E installation and auxillary buildings. | 4.4 Million | Feb 03 to Dec 03 |
| 17 | Sungai Selangor Water Supply Phase 3 (SSS3), Raw Water Pipelines – Stage 1 Gamuda Engineering S.B. SMHB S.B. | Supply and lay 5 km of 2000mmǾ MS pipes and ancillary works. | 7.5 Million | June 03 to Jan 04 |
| 18 | Cadangan Pembangunan Komplex Loji Rawatan Enapcemar diatas Rezab JBA PT246, Wangsa Maju. Mewah Kota S.B. SMHB S.B. | Sludge Treatment Plant for water Treatment Plant. Work include; pile installation, RC structures and M&E installation. | 1.8 Million | June 04 to May 05 |
| 19 | Projek Pembangunan Bekalan Air dalam Daerah Sepang. Konbina Enterprise S.B. JK Bersatu S.B. | 5MG RC reservoir. Work include earthwork, RC structure and ancillary works. | 4,6 Million | Aug 04 to Nov 05 |
| 20 | Sungai Kinta Water Supply Scheme. Hajadi S.B. Angkasa Consulting Services S.B. | Laying of 700, 800, 1000 and 1600mmǾ MS pipes (4,500m) and ancillary works. | 3.8 Million | Jun 05 to Sep 06 |
| 21 | Kerja Pengalihan Paip Bekalan Air bagi Projek Menaiktaraf Laluan B9/FT015 – Sg. Buloh Lindang S.B. Sepakat Setia Perunding S.B. | 1] 1.6 km long – 1000mm, 2000mm and 2200mmǾ MS pipes. 2] 2 Km long – 200, 250, 400,450 and 600mmǾ MS pipes’ including const. and installation of chambers and valves. | 17.0 Million | Jan 05 to Dec 06 |
| 22 | The Construction of Sewerage Treatment Plant Project Phase 2 – Package 3 at Sunggala, Port Dickson. Kajima Corp. MinConsult. S.B. | 60,000 Sewerage treatment plant along with piling and other civil works. | 19.0 Million | Aug 06 to Apr 08 |
| 23 | Syabas Capex Works programme for Upgrading of Existig Twenty-Six (26) Water Treatment Plants. Mewah Kota S.B. | 4MG RC reservoir; works include earthworks, slope stabilization, pipe laying and connection and other infra works. | 11.0 Million | July 07 to May 08 |
| 24 | Syabas Capex Works Programme for Upgrading of Existing Twenty-Six (26) Water Treatment Plants in Selangor. Mewah Kota S.B. | Refurbishment of RC reservoir; work incl. replacing the roofs and top portions of columns | 1.8 Million | Feb 09 to Jun 09 |
Sungai Selangor Water Supply Phase 2 – Stage 1 (1997)


Sungai Selangor Water Supply Phase 2 – Stage 2, Bt. Arang (Year 1999)

Sungai Kinta Water Supply Scheme, Perak (2005)

Kerja Pengalihan Paip Bekalan Air – Sg. Buloh (2007)
a) 1.6km long pipeline – 2200mm, 2000mm and 1000mm dia. MS pipes
b) 2.5km long pipeline – 150mm to 600mm dia. MS pipes.

Sewerage Treatment Plant, – 60,000 PE at Sunggala, Port Dickson (2008)