Projects Completed – Bridges
| No | Project / Client / Consultants | Scope of Works | Contract Value ( RM) | Period |
| 1 | Menggantikan Jambatan No. 532/8 Di Atas Sungai Ibai, Laluan Persekutuan 3, Kuala Terengganu. Hajadi S.B. JKR Malaysia | Design and Build Contract 400m long by 24m wide box-girder bridge; 200m constructed by the ‘Balance Cantilever’, 200m by cast-insitu and 600m by 24m approach roads | 28.0Million | Oct 95 to Mar 98 |
| 2 | North South central Expressway – Bridge over Express rail Link (ERL) am Dengkil. Loh & Loh Construction / ELITE HSSI S.B. | 6-lane dual carriageway bridge. Works include the installation of 600mmǾ spun piles and the launching of 29m pre-cast M-beams. | 1.4 Million | Dec 96 to Jul 97 |
| 3 | North South Central Expressway – Package 2A – Bridge 25 at Ch 12,000.00. UE Construction / ELITE. Ranhill Bersekutu. | 4-span dual carriageway flyover. Works include installation of 600mmǾ spun piles and launching of M-beams. | 1.4 Million | Apr 97 to Sep 07 |
| 4 | Naiktaraf Jalan Gopeng – Tapah, Laluan Persekutuan 1, Bridge over Sg. Leong & Bridge over Sg. Incap. Hajadi S.B. / JKR Malaysia | 2 nos. of pedestrian RC bridges. Works include; micro-piles, spun piles installation, launching of pre-cast beams and deck works. | 1.1 Million | Oct 99 to Apr 01 |
| 5 | CyberJaya Road C – Bridge, UE Construction S.B. Iktisas Inginieurs S.B. | 3-span bridge over river. Works include i600mmǾ spun piles, RC structure, launching of M-beams and river bank protection. | 2.1 Million | May 00 to Jan 02 |
| 6 | Kuantan Kerteh Railway Project Package II MMC / Franky Construction S.B. MinConsult | 4 nos railway river bridges & 4 Nos road over railway bridges. | 10.5 Million | Jun 00 to Sep 01 |
| 7 | Eastern Access to KLIA. Bridge and Elevated Structure works (Package 1B-2) Panzana Enterprise S.B. / JKR Malaysia Endeavour Consult S.B. | 4-span bridge interchange and a 5-span flyover. Works include installation of 600mmǾ spun piles, RC structure, beam launching and deck construction. | 8.4 Million | Sept 01 to Aug 03 |
| 8 | Naiktaraf Laluan 1, Jalan Tapah – Gopeng. Hajadi S.B. / JKR Malaysia Perunding Faisal, Abraham & Augustine S.B. | 3 nos. dual carriage bridges, RC box culverts and RC retaining walls. | 5.5 Million | Sept 01 to Oct 04 |
| 9 | Naiktaraf Laluan 58, Jalan Teluk Intan – Bidor, Hajadi S.B. / JKR Malaysia Prima Konsult S.B. | 4 nos. bridges, RC box culverts and piled embankment. | 7.0 Million | Dec 01 to Dec 04 |
| 10 | Membina dan Menyiapkan Jalan dari Simpang B15-B11, Daerah Sepang. Majulia S.B. / JKR Malaysia Sigmas Jelas Engineering S.B. | 24m long x 13.5m wide and 18m long x 13.5m wide RC bridges across Sg. Rasau and Sg. Anak Rasau | 1.5 Million | May 03 to Mar 04 |
| 11 | Memperelokkan Jalan Ipoh – Butterworth, Laluan 1, Daerah Larut Matang & Selama, Taiping, Perak DR Hajadi S.B. / JKR Malaysia | 2 nos. of bridges over rivers. Works include; temporary steel bridge, piling works, coffer dams, beam launching and deck slab | 4.1 Million | July 03 to July 04 |
| 12 | Interchange, Toll Plaza & Access Road at Km 419.1 of the North-South Expressway Franky Construction S.B. T&T Konsult S.B. | 2 nos. of bridges and box culverts. Works include; pile installation, RC structure, beam launching over expressway and deck works. | 4.0 Million | July 04 to Jan 06 |
| 13 | Merekabentuk, Membina dan Menyiapkan Projek Jalan Pintas Bandar Muar. Ranhill Civil S.B. | Elevated U-turn at Jalan Kesang. Cast insitu RC box girder viaduct | 2.0 Million | Oct 04 to Feb 05 |
| 14 | Floyover KTM track at Bandar Mutiara Seberang Perai Selatan. Bina Goodyear B. | 210m long by 10m wide bridge over KTM line including approach roads. | 3.0 Million | Jun 05 to Aug 06 |
| 15 | Program Menilai / Mengganti / Membaiki Jambatan di Laluan Persekutuan Struktur No. FT 001/623/40 Kuala Kangsar Idaz S.B. NRS Associates | Single span bridge 14m long by 21m wide. Work include; installation of 600mmǾ bored piles, T-beams launching and deck works. | 1.3 Million | Aug 05 to Sep 06 |
| 16 | NS Expressway Third Lane Widening Bridge over Sg. Guntong. Verde Mount Corp. MinConsult S.B. | Single span bridge. 32m by 7m. Works include; 600mmǾ bored piles, I-beams and RC structure. | 0.8 Million | Mar 06 to Sep 06 |
| 17 | Access Road Connecting to the Interchange at Km 419.1 NS Expressway Franky Construction S.B. T&T Consult S.B. | Single span bridge over river, 20.7m by 22.9m wide. Works include launching of 16 nos. of T-beams. | 0.7 Million | Nov 06 to Jan 07 |
| 18 | Construction of Kuala Sawah STP (Phase 2 Package 3)- Bridge over Railway. Kajima Corp. MinConsult S.B. | 27m long by 10m wide, bridge. Work include; 600mmǾ bored piles, RC structure and beam launching over railway tracks. | 1.4 Million | Jan 07 to May 07 |
| 19 | The Construction and Completion of Structure Works for Duta Ulu Kelang Expressway (DUKE)-Section 3 & 1B Pembinaan Hamid Abd. Rahman S.B. HSSI S.B. | i) 45m long by 27m wide bridge; works include casting and stressing of 13 nos of 45m long T-beams ii) Twin Vehicular box-culverts, 47.2m by 13.5m by 6m high iii) 2nos of ‘Pedestrian’ bridges | 3.8 Million | Mar 07 to Sep 08 |
| 20 | Project Membina Jambatan Di Atas Sungai Pahang Di Kuala Krau, Termeloh, Franky Const. / Binaan Desjaya S.B. JKR Malaysia | 490m long by 14.9m wide bridge crossing Sg. Pahang, work include; i) 330m by balanced cantilever ii) 160m In-situ box girders iii) 750mm/1500mm Ǿ bored piles | 34.2 Million | Nov 07 to Dec 09 |
| 21 | Design and Build for The Privatization of KL – Kuala Selangor Expressway. Templer Interchange. Mudajaya Corp. Berhad. Endeavor Sdn.Bhd. | Construction of 6nos. of RC ramps including piling, launching of 112 nos of U-12 beams. | 15.0 Million | Dec 09 to Jun 11 |
| 22 | Interfacing Between LPT2 and Jalan Ibuk. Subcontract for Bridge Structure Work – Bridge at Jalan Ketengah | Construction of 4 spans bridge structure over new LPT2, launching of 28 nos of U12 beams | 1.87 Million | May 10 to Oct 11 |
| 23 | Privatisation of South Klang Valley Expressway – Section 3 The Construction and Completion of Bridge Structure and Associated Works from Abutment A to Pier 15 for Bridge Over Main Access to Pulau Carey & Sg. Langat – BR 15 | 740m length x 14.2m wide Bridge . Works include: a)270m by Balanced Cantilever method b)470m by Precast Beam c)Launching of 84 nos 40m/35m length Post Tensioned T-Beam | 15.57Million | Oct 10 to Jun 12 |
| 24 | Projek Pembinaan Jejambat Menghubungkan Jalan Nangka Dengan Jalan Perda Timur merentasi Jalan Padang Lalang / Lintasan Keretapi / Jalan Permatang Rawa, Bukit Mertajam, Pulau Pinang Gold Bridge Eng. & Construction S/B | Construction and Completion of (444m + 160m) RC Bridge Works and all necessary road upgrading to connect Jalan Nangka and Jalan Perda Timur. | 110 Million (JV with Oriental Unity S/B) | Feb 12 to Jun 16 |
| 25 | Projek Pembinaan Jalan Pintas Rawang Bagi Mengatasi Kesesakan Lalulintas Di Bandar Rawang Secara ‘Design And Build ‘: Jajaran Alternatif Yang Melalui Taman Warisan Negeri Selangor (Elevated Structure) – Alternative Proposal from Pier 51 to Abutment B Panzana Enterprise Sdn. Bhd. | Construction of 4 span continuous box girder with the span length of 64m-114m-114m-64m using free cantilever method with traveling form and 6 span of conventional precast T-beams with insitu deck slab structure with average span length of 34.0m. | 45.3 Million | Feb 13 to Aug 16 |
| 26 | Projek Pembinaan Jalan Pintas Rawang Bagi Mengatasi Kesesakan Lalulintas Di Bandar Rawang Secara ‘Design And Build ‘: Jajaran Alternatif Yang Melalui Taman Warisan Negeri Selangor (Elevated Structure) – Transition Span from Pier 50 to Pier P51 Panzana Enterprise Sdn. Bhd. | Construction of 40m length superstructure works from P50 to P51. Works including casting & launching of 12 nos 40m length T-beams over 36m height and construction of bridge diaphragm, deck slab and parapet works | 1.80 Million | Jan 16 to July 16 |
| 27 | Projek Menaiktaraf Jalan Persekutuan FT54 Dari Sungai Buloh Ke Assam Jawa, Daerah Kuala Selangor, Selangor (the “Project”) Aktif Unggul Sdn. Bhd. | Construction of 1 no New Bridge at CH19+135; 1 no Bridge Widening at CH 23+750, 2 nos Pedestrian Bridge at CH11+680 and CH 6+400 and Piled Embankment. | 13.1 Million | Jan 17 to Sep 19 |
| 28 | Projek Lebuhraya Putrajaya-KLIA (MEXII) Bridgeworks For Packages 7 – BR15c & Package 9 – BR17 Maju Holdings Sdn. Bhd. | Package 7 : 2 x 6 spans of 45m long x 16.15m width bridge (Total 270m) over retention pond Package 9: 2 x 6 spans of 45m long + 2 x 1 span of 50m long x 16.15m width bridge (Total 320m) over Sg. Langat & Sg. Labu. Scope of work include bored piles foundation, piers, casting & launching of 45/50m post tensioned T-beams, diaphragm, bridge deck and miscellaneous bridge furniture. | 61.5 Million | Mar 17 to Sep 18 |
| 29 | Projek Lebuhraya Putrajaya-KLIA (MEXII) Bridgeworks For Package 1 – Bridges 17a, 18 and 18a Maju Holdings Sdn. Bhd. | Bridge 17a (450m long), Bridge 18 (96m long) and Bridge 18a (285m long) Scope of works include spun piles foundation for BR 17a & 18a and bored piles foundation for P16 of BR18, piers supply & launching of 165 nos pretensioned beam (30m & 25m long for BR17a & 18a) and 12 nos post tensioned T-beams (48m long for BR18) diaphragm, bridge deck and miscellaneous bridge furniture. | 32.2 Million | Oct 17 to Apr 19 |
| 30 | Projek Penswastaan Lebuhraya Bertingkat Damansara Shah Alam (DASH), Package CA4: Construction & Completion of Mainline And Other Associated Works from CH.4983 to CH. 9307 The Fabrication and Casting of Post-tensioned Prestressed T-Beams (Step-In for MKP Builders Sdn Bhd Works) Panzana Enterprise Sdn. Bhd. | Construction & Completion of 267 nos precast post-tensioned T-beams | 25.80 Million | Aug 19 to Oct 20 |
| 31 | Projek Penswastaan Lebuhraya Bertingkat Damansara Shah Alam (DASH), Package CA4: Construction & Completion of Mainline And Other Associated Works from CH.4983 to CH. 9307 Bridge Works – Substructure, Superstructure, Approach Road & Bridge Pavement and Miscellaneous Works For Ramp 4A, Ramp 5A and Ramp 6A (Step-In for Perkasa Jauhari Sdn Bhd’s Works) Panzana Enterprise Sdn. Bhd. | Construction & Completion of : a)Superstructure works for Ramp 4A from Abutment to Pier P04 b)Substructure works for Ramp 5A from Abutment to Pier P12 c)Superstructure works for Ramp 5A from Abutment to Pier P29 d)Superstructure works for Ramp 6A from Abutment to Pier P04 | 11.65 Million | Sep 19 to 29 Mar 21 |
| 32 | PROJECT Penswastaan Lebuhraya Bertingkat Damansara Shah Alam (DASH), Package CA4: Construction & Completion of Mainline And Other Associated Works from CH.4983 to CH. 9307 Bridge Works – Substructure, Superstructure, Approach Road & Bridge Pavement and Miscellaneous Works For Mainline , Ramp 5A and Ramp 8A and Ramp 8B (Step-In for Cheah Builders Sdn Bhd’s Works) Panzana Enterprise Sdn. Bhd. | Construction & Completion of : a)Superstructure works for Mainline (P93-P107) – Pilecap , Pier & Crosshead b)Substructure works for Ramp 5A from P56-P59 Deck Slab c)Superstructure works for Ramp 8A Pilecap, Pier & Crosshead of Pier from Abutment to Pier P18 d)Superstructure works for Ramp 8B Deck Slab from Abutment to Pier P06 | 16.14 Million | Oct 19 to 29 Mar 21 |
| 33 | Projek Penswastaan Lebuhraya Bertingkat Damansara Shah Alam (DASH), Package CA4: Construction & Completion of Mainline And Other Associated Works from CH.4983 to CH. 9307 Sub-contract: Bridge Works Nc2b – (Substructure, Superstructure And Cantilever Slab For Mainline (P86-p92) And Ramp 5a (P51-p56) Panzana Enterprise Sdn. Bhd. | Construction & Completion of : a)Balance Substructure Works from Pier ML4/P86 to ML4/P90 b)Superstructure works from ML4/P85 to ML4/P92 c)Balance Substructure Works from R5A/P52 to R5A/P55 d)Superstructure works for Ramp 5A from Pier R5A-ML4/P85 to Pier R5A/P55 e)Cantilever Slab Above RE Wall from R5A/P39 (Abutment) to R5A/P47 (Abutment) | 15.40 Million | 1 June 2020 to 29 Mar 21 |
| 34 | Projek Penswastaan Lebuhraya Bertingkat Damansara Shah Alam (DASH), Package CA4: Construction & Completion of Mainline And Other Associated Works from CH.4983 to CH. 9307 Bridge Works NC3 – (Substructure, Superstructure and Miscellaneous Works For Ramp 7A and Ramp 7C) Panzana Enterprise Sdn. Bhd. | Construction & Completion of : a)Remaining Sub-Structure and Superstructure works for Ramp 7A b)Remaining Sub-Structure and Superstructure works for Ramp 7C from Abutment to Pier P04 and Pier P07 to Pier R7C/R5A/P58 | 12.51 Million | 1 June 2020 to 29 Mar 21 |
| 35 | Proposed Construction And Completion Of Elevated Roads Crossing Junctions At-Persiaran Atmosfera/ Persiaran Jati (J6), Upgrading Of Four (4) Arm At Grade Junction At Kwassa Puteri/ Persiaran Sg. Buloh (J5) And Ancillary Works Along Jalan Sungai Buloh At Kwasa Land Damansara Township Development In Sungai Buloh, Selangor Darul Ehsan For Kwasa Land Sdn Bhd. Work Package: WOB 2 TSR Bina Sdn. Bhd. | To supply labour, material, plant, machineries and equipment for the Construction and Completion of balance Bridge Structure left over by previous contractor at Junction 6 | 5,686 Million | 14 Mar 2022 to 31 July 2023 |
Jambatan No. 532/8 Di-Atas Sg. Ibai – K. Terengganu (1998)

Traveller form in action over the 100m long center span. Note the temporary bridge on the left
Kuantan Kerteh Railway Project Package II, Kemaman, Terengganu.(2001)

Launching of precast beams at Sg Kemaman Bridge

Eastern Access To KLIA, Bukit Changgang, Daerah Kuala Langat. Selangor (2003)
4-span bridge at Interchange and 5-span flyover bridge.


Memperelokkan Laluan 1, Daerah Larut Matang & Selama (2003)
6-span bridge over Sg. Sepetang – PC beam launching from temporary bridge

Bukit Tagar Interchange (2006)

Interchange at Km 419.1 of the North-South Expressway (2006)

Jambatan Di Atas Sg. Pahang (2009)


KL – Kuala Selangor Expressway – Templer Interchange, KLSE (2010 – 2011)


SKVE – Bridge BR15 (Abutment A to Pier 15) (2012)


Jambatan Bandar Perda – Pulau Pinang (2012)
Construction and Completion of (444m + 160m) RC Bridge Works and all necessary road upgrading to connect Jalan Nangka and Jalan Perda Timur.


Rawang Bypass, Phase II – Elevated Bridge P51 to Abutment B (2013)
Construction of 4 span continuous box girder with the span length of 64m-114m-114m-64m using free cantilever method with traveling form and 6 span of conventional precast T-beams with in-situ deck slab structure with average span length of 34.0m.


Rawang Bypass, Phase II – Transition Span P50 to P51 (2016)
Casting & launching of 12 nos 40m long T-Beams including superstructure works from Pier P50 to P51


Projek Menaiktaraf Jalan Persekutuan FT54 Dari Sungai Buloh Ke Assam Jawa (2017-2018)


Projek Menaiktaraf Jalan Persekutuan FT54 Dari Sungai Buloh Ke Assam Jawa (2019)


Projek Lebuhraya Putrajaya-KLIA (MEXII) Bridgeworks For Packages 7 & 9 – BR15c & BR17 (2017-2018)




Projek Lebuhraya Putrajaya-KLIA (MEXII) Bridgeworks For Package 1 – Bridges 17a, 18 and 18a (2018)




DASH, CA4
PRECAST POST-TENSIONED T-BEAMS (2019)


BRIDGE WORKS – SUBSTRUCTURE & SUPERSTRUCTURE WORKS (2019)


Bridge works at Junction 6, WOB2 Kuasa Land (2022-2023)